Permits · type
Road Cut permits in Syracuse: 1,561 on file
1,561 Road Cut permit records in Syracuse, NY — 3.3% of the city's permit file (1980–2025), with addresses and work described.
The city's permit export has not been refreshed since August 16, 2025. Everything on this page is historical.
Road Cut accounts for 1,561 of the 47,902 permit records in the city's file — 3.3% of the total.
Records by year
Frequent applicants of record
Names as filed on the permit. A count of filings, not a judgement about any party.
- National Grid — 29 permits
- Buza Construction of CNY, Inc. — 7 permits
- Courcy Enterprises Inc — 4 permits
- Flock Group Inc/ DBA Flock Safety — 3 permits
- Syracuse Utilities — 3 permits
- Cashless Tolling Constructors LLC — 2 permits
- Onondaga County Department of Facilities Management — 2 permits
- Green Scapes Inc — 2 permits
- Verizon New York Inc — 2 permits
- Atlantic Testing Laboratories — 1 permits
Road Cut permits on file
| Issued | Address | Work described | Owner of record | Permit # |
|---|---|---|---|---|
| 2025-02-21 | 605 Walnut Ave | Install 95' - 2 plastic gas service piping to service 605 Walnut Ave. | National Grid | PC-0046-25 |
| 2025-02-14 | 206 Crouse Ave N | Cashless Tolling will be INSTALLING AN AIR MONITORING SYSTEM IN THE CITY NEAR I-690 as part of NYSDOT D265136 I-81 CONTRACT 4Statement on application indicates that non vehicle or pedestrian traffic w | Cashless Tolling Constructors LLC | PC-0016-25 |
| 2025-02-12 | Remove a 6-inch pavement core at select locatonsSample the subsurface with a 2-inch soil sampler to a depth of 2 feetBackfill core holes with onsite soil and Cold-Patch upon compleatitionLocation: On | Atlantic Testing Laboratories | PC-0038-25 | |
| 2025-02-06 | Full street and sidewalk closure along the 400 block of N. Lowell Ave to complete the new storm and sanitary/sewer tie in. Temporary cold patch at limit of pavement removal shown. City is re-paving th | Fab Site Industries LLC | PC-0017-25 | |
| 2025-02-04 | 262 Lafayette Ave W | Install new 1 plastic gas service line to service 262 W Lafayette Ave from existing 4 gas main. | National Grid | PC-0025-25 |
| 2025-02-04 | Install Gas Main Barriers to existing above ground gas main at 2 locations (Brampton & Cheltenham), no digging required. This work will not impact traffic or pedestrians. | TRC Engineers | PC-0659-24 | |
| 2025-02-04 | 235 Harrison St & Warren St S | Sprinkler Tie-in to building located at 235 Harrison Street | Hueber-Breuer Construction Co Inc | PC-0582-24 |
| 2024-12-13 | 1117 Fayette St W | Install conduit & primary from MH 921 to PM switchgear 921-A, back to MH 921. Install primary through customer installed conduit from Pad 921-A to PM Xfmr 921-B. Tap on customer service. | National Grid | PC-0596-24 |
| 2024-12-12 | 451 Solar St | The specific work to be performed in the street consists of the connection of new stormwater and sanitary sewer piping to the existing manhole infrastructure located on Solar Street. The total duratio | Onondaga County Department of Facilities Management | PC-0626-24 |
| 2024-12-12 | 451 Solar St | Installation of one electric pole in the Solar Street ROW to provide a temporary electric service for the construction site. The pole will be removed once the permanent electric service is installed a | Onondaga County Department of Facilities Management | PC-0627-24 |
| 2024-11-25 | 121 Nottingham Rd | Expose Storm drain along road edge of Nottingham road in front of 121 Nottingham- Connect drainage pipe to storm drain per city engineering to alleviate water from back yard- Backfill in accordance to | Michael Grimm Services Inc | PC-0468-24 |
| 2024-11-25 | 484 Salina St S & Onondaga St W & | 1. PROPOSED CROWN CASTLE 2 CONDUIT VIA DIRECTIONAL BORE FOR 610' FROMEXISTING UTILITY POLE NM1 - NYT1 UNDER GIFFORD ST AND S CLINTON ST THEN NORTHALONG SOUTH CLINTON ST TO 484 SOUTH SALINA ST.2. PROPO | Crown Castle Fiber LLC | PC-0372-24 |
| 2024-11-22 | Installation of 12ft pole to house ALPR camera and solar panel for use by DeWitt Police Department to assist with criminal investigations. | Flock Group Inc/ DBA Flock Safety | PC-0469-24 | |
| 2024-11-16 | National Grid is in the process of designing a Utility Thermal Energy Network (UTEN) under the direction of the NY PSC per the 2022 UTENJA legislation. Once approval is granted for execution, this wil | National Grid | PC-0551-24 | |
| 2024-11-13 | 500-50 Salina St S & Onondaga St | Install temporary fencing at edge of curbRemove existing sidewalksRepair existing basement vaultsInstall new sidewalks | The Hayner Hoyt Corp. | PC-0565-24 |
| 2024-11-12 | INSTALLATION OF 1 AUTOMATIC LICENSE PLATE READING (ALPR) CAMERA WITHIN CITY ROW ON BEHALF OF SYRACUSE PD FOR ASSISTANCE WITH CRIMINAL INVESTIGATIONS.Camera # 26 | Flock Group Inc/ DBA Flock Safety | PC-0515-24 | |
| 2024-11-12 | Installation of 14 ALPR cameras within the City's ROW. See attached plans for locations.. | Flock Group Inc/ DBA Flock Safety | PC-0523-24 | |
| 2024-11-06 | 4,100 total feet of Water Main installed on Kimber Road, Killian Drive, Wyndham Drive in Syracuse. This watermain is to be installed for the city Water Department Project of the Guilford Rd Pump stati | JJ Lane Construction, Inc | PC-0525-24 | |
| 2024-11-02 | WE ARE INSTALLING TEMPORARY WOOD POLES TO MOUNT VIDEO CAMERAS TO TO MONITOR THE I-690 REHABILITATION PROJECT. THE POLES WILL COME DOWN AT THE COMPLETION OF THE PROJECT.Locations as Follows;Corner of E | Cashless Tolling Constructors LLC | PC-0589-24 | |
| 2024-10-25 | Work in the Martin Luther King Dr. Right of Way. Work includes converting 178 SF from asphalt to porous asphalt and 210 SF from asphalt to lawn.Address Given: 219 MLK West | Salt Springs Paving Corp | PC-0505-24 | |
| 2024-10-19 | The proposed scope of work for GRS 824-076 may include:• Removing the north oil seal relief, which is below-grade in grass;• Removing the east oil seal relief, which is below-grade in grass;• Excavati | National Grid | PC-0531-24 | |
| 2024-10-18 | 414 Lodi St | ASLF’s One Million Gallons! Program, in partnership with Syracuse Cultural Workers, has installed a 2000sf porous asphalt system at 414 Lodi Street to manage stormwater runoff from a total of 6140sf i | Green Scapes Inc | PC-0513-24 |
| 2024-10-18 | 408 Lodi St | ASLF’s One Million Gallons! Program, in partnership with Syracuse Cultural Workers, proposes the installation of a bio-retention system at 408 Lodi Street to manage stormwater runoff from a total of 5 | Green Scapes Inc | PC-0514-24 |
| 2024-10-12 | Install sewer service at 303 Baker Ave | Courcy Enterprises Inc | PC-0397-24 | |
| 2024-10-12 | 209 Woodland Ave | Install sewer service | Courcy Enterprises Inc | PC-0400-24 |
| 2024-10-05 | 221 Warren St S & Fayette St | Repair of an existing underground transformer vault located on a City of Syracuse Sidewalk. - 221 S Warren St. 1. Vault Caps to be lifted off supporting steel beams. 2. Four existing steel beams to be | JPW Structural Contracting | PC-0283-24 |
| 2024-10-03 | Tap into medium pressure main in the intersection of E Water St and S Crouse Ave. Install main on Crouse Ave and down Canal, east of S Crouse Ave to the intersection of Lodi. Pressure test existing ma | National Grid | PC-0452-24 | |
| 2024-10-03 | Location Given....501 E Genesee Sthe proposed scope of work for GRS 015 may include:•Removing the current oil seal relief, which is below-grade in the sidewalk;•Excavating from the station outlet to t | National Grid | PC-0481-24 | |
| 2024-10-03 | Location listed 1045 S Salina StScope of Work:The contractor shall provide any excavation and restoration work and materials. National Grid shall provide all gas materials for the vault, piping, and r | National Grid | PC-0480-24 | |
| 2024-10-03 | Performing bump out and vertical offset of Medium Pressure main on E Water St near address: 1205 ERIE E BLVD SYRACUSE NY 13210, due to conflict with proposed DOT I-81 contract 4 work | National Grid | PC-0451-24 | |
| 2024-10-03 | 110 Almond St & Water St &Washin | Need to relocate gas main on Almond St (Catherine St) between E Water St and Erie Blvd E, due to conflict with proposed drainage for I-81 contract 4 work | National Grid | PC-0496-24 |
| 2024-10-01 | Install Sewer Service at 1540, 1542,1604,1608,1614,1618 S State St. | Courcy Enterprises Inc | PC-0114-24 | |
| 2024-09-12 | Verizon contractor to repair conduit blockage in several spots in the City of Syracuse. I advised Verizon that Buckley Rd is not in the system | Verizon New York Inc | PC-0328-24 | |
| 2024-09-12 | Repair water main break | Courcy Enterprises Inc | PC-0463-24 | |
| 2024-09-12 | 201 Furman St | Install 65' - 1 plastic gas service from existing 6 steel main. | National Grid | PC-0470-24 |
| 2024-09-10 | 1146-54 Salt Springs Rd & Demong | Removal of unsightly brush and existing asphalt drive at Salt Springs Road. Added Parking lot with new curb cut with added curbs and bump out at Salt Spring Road. Site also includes stormwater managem | Lemoyne College | PC-0308-24 |
| 2024-08-31 | Gas main replacement- on Carlton Drive from East Genesee Parkway to East Genesee Street. Pursuant to the newly signed Roadway Excavation Quality Assurance Act (S.4887/A.5608), which has become effecti | National Grid | PC-0615-23 | |
| 2024-08-31 | Retire existing 4 cast iron and 4 plastic gas main on Merz Ave from Farmer St to Park and Install 2 plastic medium pressure gas main in green space on East side of road. Pursuant to the newly signed R | National Grid | PC-0642-23 | |
| 2024-08-31 | wenty-four (24) pavement core and subbase samples to be collected along Teall Ave and Grant Boulevard. Please note only four (4) of these appear to fall within City of Syracuse limits (Cores C-1 throu | CME Associates | PC-0453-24 | |
| 2024-08-30 | Replace existing 4 cast iron and 4 plastic low pressure gas main on Whitwell Dr from Farmer to Park St with 2 plastic 24# gas main under east sidewalk and east side of road. Pursuant to the newly sign | National Grid | PC-0643-23 | |
| 2024-08-24 | Install a 2” plastic valve on existing 2” plastic 24# gas main on Allen St and E Genesee St intersection in grass area. | National Grid | PC-0381-24 | |
| 2024-08-24 | Part of I-81 contract 2, the DOT is demolishing the E Glen Ave bridge and building a new bridge south of the existing bridge. There is active gas main on the existing bridge that needs to be retired a | National Grid | PC-0405-24 | |
| 2024-08-24 | 2850-52 Salina St S | Retire 2 gas service at existing gas main located in the sidewalk. | National Grid | PC-0407-24 |
| 2024-08-20 | Install 160ft of 4 conduit along S. Townsend Street from AT&T manhole #1 to VZ MH 116C (in the intersection of S. Townsend St and E. Fayette Street). Road closure plan attached. | Syracuse Utilities | PC-0200-24 | |
| 2024-08-20 | 420 Taylor St E | Install 72 feet of conduit in the right-of-way along Taylor Street for communication line from AT&T manhole #5 To utility pole NG P. 17. | Syracuse Utilities | PC-0201-24 |
| 2024-08-19 | 611 Walnut Ave | Mirza requested that we apply. The job is already completed. New domestic and sprinkler tap done. | Buza Construction of CNY, Inc. | PC-0375-24 |
| 2024-08-19 | 613 Walnut Ave | Mirza requested that we apply. Job is completed. New domestic and sprinkler tap done. | Buza Construction of CNY, Inc. | PC-0376-24 |
| 2024-08-19 | 2027 Park St & Hiawatha Blvd E | Install (1) - 4 underground communications conduit 5 feet long from existing Verizon manhole to existing utility pole. All work will be performed from the parking lot of 2027 Park Street. No pedestria | Syracuse Utilities | PC-0417-24 |
| 2024-08-17 | 517 Walnut Ave | road cut work happening is the sewer, domestic and sprinkler tap and the lateral and sidewalk being done in the right of way | Buza Construction of CNY, Inc. | PC-0330-24 |
| 2024-08-17 | 603 Walnut Ave | road cut work happening is the sewer, domestic and sprinkler tap and the lateral and sidewalk being done in the right of way | Buza Construction of CNY, Inc. | PC-0332-24 |
| 2024-08-17 | Gas main replacement project on East Corning Avenue from South Salina Street to the east end of East Corning Avenue. “Pursuant to the newly signed Roadway Excavation Quality Assurance Act (S.4887/A.56 | National Grid | PC-0014-24 | |
| 2024-08-17 | 601 Walnut Ave & Madison St | road cut work happening is the sewer, domestic and sprinkler tap and the lateral and sidewalk being done in the right of way | Buza Construction of CNY, Inc. | PC-0331-24 |
| 2024-08-16 | 208 Walnut Pl | Road cut to allow for new water service connection to be done by City of Syracuse | Rich & Gardner Construction Company | PC-0378-24 |
| 2024-08-15 | We have a need to take 6 Geotechnical soil borings via a drill rig using NYSDOT forces. The soil borings will be drilled along Evans St, Websters Landing, Brown St and N. McBride St within the City of | NYS Department of Transportation | PC-0383-24 | |
| 2024-08-10 | Installation of 6-5 PVC conduits encased in concrete from existing National Grid MH 3 in the south Burt St sidewalk across Burt St to Centrio property on the north side of Burt St....approximately 120 | National Grid | PC-0281-24 | |
| 2024-08-10 | 701 Warren St S & Adams St E | Install new 4 plastic gas service from existing 2 gas main located 40' N of centerline of road on E Adams St. | National Grid | PC-0419-24 |
| 2024-08-07 | Replacing existing 4” plastic low pressure gas main on Farmer St from Merz to Oak St with 2 plastic medium pressure gas main. Pursuant to the newly signed Roadway Excavation Quality Assurance Act (S.4 | National Grid | PC-0634-23 | |
| 2024-08-07 | Gas main replacement project on Westmoreland Avenue from Euclid Avenue to Houston Avenue. No disruption to road pavement on Houston Ave due to paving moratorium.Pursuant to the newly signed Roadway Ex | National Grid | PC-0641-23 | |
| 2024-08-02 | 930 James St | Renovations to an existing curb cut at 930 James St. will include removing the existing pavement in the R.O.W., lowering the driveway at the sidewalk, and repaving. The current driveway is very steep | George/Rebecca Barnes Fndtn | PC-0356-24 |
| 2024-07-25 | I-81 PROJECT PHASE2, PIN 3501.94Danella to install underground conduit system and manhole. Verizon to pull new cables, splice, and remove old structures. | Verizon New York Inc | PC-0086-24 | |
| 2024-07-25 | Relocation of poles and primary underground feed at request of NYSDOT along E Water St & Burnet Ave. | National Grid | PC-0349-24 | |
| 2024-07-25 | Install new 2 plastic valve on 2 plastic medium pressure gas main in the street ( Valve is near the corner of Lexington Ave and Allen St ) | National Grid | PC-0208-23 | |
| 2024-07-18 | REPLACE GAS MAIN ON MEADOWBROOK DR N/E BOUND LANE FROM SCOTTHOLD TER TO BRADFORD PKWY. | National Grid | PC-0366-24 | |
| 2024-07-18 | 519 Walnut Ave & Madison St | road cut work happening is the sewer, domestic and sprinkler tap and the lateral and sidewalk being done in the right of way | Buza Construction of CNY, Inc. | PC-0312-24 |
| 2024-07-17 | Replace existing 4 cast iron and 4 plastic low pressure gas main on Hier Ave from S Carbon St to North end with 2 plastic medium pressure gas main. Pursuant to the newly signed Roadway Excavation Qual | National Grid | PC-0632-23 | |
| 2024-07-17 | Gas main replacement project on Sedgwick Street from Dorothy Street to Robinson Street.Pursuant to the newly signed Roadway Excavation Quality Assurance Act (S.4887/A.5608), which has become effective | National Grid | PC-0650-23 | |
| 2024-07-17 | We are looking to install 4” plastic 24# gas main on S Carbon St from Hier Ave to Grumbach 3’ South of the current main in grass area. Pursuant to the newly signed Roadway Excavation Quality Assurance | National Grid | PC-0645-23 | |
| 2024-07-15 | 605 Walnut Ave | road cut work happening is the sewer, domestic and sprinkler tap and the lateral and sidewalk being done in the right of way | Buza Construction of CNY, Inc. | PC-0313-24 |
| 2024-07-12 | Main Replacement from W. Genesee St. to Rann Ave to replace low pressure cast iron and SB with 2 plastic medium pressure gas main.Pursuant to the newly signed Roadway Excavation Quality Assurance Act | National Grid | PC-0631-23 | |
| 2024-07-12 | 1819 Genesee St W & Avery Ave | Connecting roof drains from building to existing drainpipe in grass area between store and sidewalk as highlighted in attachment. At no time during construction will sidewalk be closed to pedestrian t | Apex Companies | PC-0360-24 |
| 2024-07-10 | 1415-17 Midland Ave | Installation of new water and sanitary service for 1514-1528 and 1415-1429 Midland | JK Tobin Construction Co Inc | PC-0121-24 |
Other permit types
- Electric (9915)
- Misc.(deck, fence,ramp) (5007)
- Res. Remodel/Chg Occ (4600)
- HVAC/Mechanical (3937)
- Com. Reno/Rem/Chg Occ (3674)
- Sprinkler (3431)
- Sidewalk Replace (1568)
- Road Cut (1561)
- Electric (Meter Set) (1558)
- Liability Waiver (1543)
- Demolition (1467)
- Fire Alarm (1363)
- Parking Meter Rental (991)
- Sign (892)
- Public Assembly (637)
- Security Alarm (608)
- Loading Zone (Business) (582)
- Sidewalk Cafe (530)
- Block Party (Business) (501)
- Site Work (469)
- Elevator (414)
- Small Cell (409)
- Antenna / Dish (304)
- Block Party (Residential) (289)
- Encroachment (Converted) (263)
- Pool / Hot Tub (212)
- Res. New 1-2 Family (171)
- Com. New Building (152)
- FPB Tank - Removal (135)
- Curb Cut (124)
- FPB Propane (111)
- Encroach (Minor) (106)
- Oversized Vehicle (74)
- Encroach (Deminimus) (61)
- Footing / Foundation (45)
- FPB Tank - Installation (39)
- Overweight Vehicle (38)
- Encroach (Major) (33)
- Film Permit (29)
- Tent (26)
- FPB Private Pump (9)
- Blight Busting Permit (6)
- Sprinkler - Kitchen Hood (5)
- Sprinkler - Clean Agent (4)
- FPB Tank - Abandon (3)
- MBE Certification (3)
- MWBE Certification (2)
- Bike Share Operating (1)
See also all Syracuse permits · method.
Last refresh October 7, 2026. Syracuse Data Desk.
Get the weekly Syracuse data digest
One email a week: what the city's own records show about vacant houses, code complaints and new construction. No ads, unsubscribe anytime.
We publish the raw numbers behind every story. Read the method.